Friday 7 December 2012

The final "Installment"

   The fired Navaho Wagon was labelled and ready to install.






The lines were passed up from below to the top of the deck.





  The lines were secured above the installation area with wood pieces and nails. 





  Set-up of the bull kelp and arranging the rocks to hold the holdfasts was tricky in high winds and rain.






The halogen light cast shadows on the enclosure.






                           
The holdfasts needed to be braced by the rocks because of the wind.     







 The anenome was added for effect.






It is a source of great amazement to me that it is and remains UP:)






The Beginning:)  Thanks!
Posted by Picasa

No comments:

Post a Comment